Well, we are 3 weeks underway of getting the farmhouse – livable.

Here are the things we have done:

  1. removed all bathrooms that were not supposed to be there
  2. re-did the main bathroom on the first floor
  3. removed all debris from the yard/house
  4. starting painting
  5. hung window treatments
  6. got all new appliances
  7. installed new well system
  8. installed washer & dryer
  9. repaired all rusted windows
  10. removed paint from all window sills
  11. installed new furnace and water heater

It’s been A LOT of work.  Thankfully, Lois has been a huge help with most of these items – the yard looks 1000% better due to her. On the days we were able to tackle things together it felt like we got a lot more done than I would have ever imagined.  My Pops has been a major help in figuring out what we can/can’t do electrical wise and prepping for Connelly Power Co to jump in on some things.  We still can’t live there until we resolve the electrical issue for the water pump/well system. That is the most frustrating part, since we really can’t live there without water, but everything will be easier to work on, continue to deal with once we live there.  Right now, every moment over there has to be utilized 100% so I think I speak for everyone, but I’m tired.  I love working on the house and it is really rewarding and exciting, but it’s just hard to not have a bathroom to use there, or water to use – and it’s hard to drive back and forth to our apartment in Broomfield (30 minutes away). Eh, but why am I bitching? I fought super hard to do all this – just at a different pace I think, but oh well in a months time or less it won’t feel ‘so close, yet so far’.  Plus, a lot of the things I had planned on spacing out over 2 years will now just be done. So when we do move in we can literally just start enjoying it instead of prolonging some of this fun.

Moving forward I’ll being doing more ‘before and after’ shots on our progress – now that there are some really impressive ‘afters’!

Thanks again, Lois, Pops, Uncle Mark (MD Services – my HVAC/plumbing hero), Aunt Lori, and everyone else in their virtual support so far in helping us get this fixer upper livable!

Here are some photos of the recent happenings:

25951383470_2778cec84b_c
Lois cleaned up the front yard and what a difference! So clean and pretty!
25574083020_e5e35b43d9_c
just some of the yard debris we cleaned up – broken glass/car parts?
26034230246_805e2f10ff_c
it’s the simple things although it is still un-used due to no water at the house. 

26136012301_1671703525_c26136011521_13d3cf42ec_c

26176438466_8454730390_c
Leopold was in love with the house – and so cute on his house tour.
25599736173_031a6b4142_c
A sight for sore eyes – new well jet pump and tank (note no longer in the crawl space under the stairs).
25945618002_508297bf89_c
‘oily beau hunk’ installs my cellular ikea blinds also Sixteen Candles joke. 
26034229176_fbc0d6782d_c
new washer and dryer – thanks pops and cym! 
26012789156_5d68275597_c
window sill- i’m blue da bo dee ba de dow….. 
25929529920_bc93c84f3d_c
look at the sexy new copper plumbing for my washroom…. rawwwr!
25764461400_0a8b7c7708_c
before: yard cage for former tenants that didn’t pay rent…..
26202533165_f704ab80b2_c
after: bunny coop/chicken larvae den removed. just a nice space for appropriate plants.

 

 

One thought on “Farm House Update: Week 3

Leave a comment